Specifications include, but are not limited to: Perpetuation project to resurface approximately 10.58 centerline miles of USH 8 from the Rusk County line to Jump River Bridge in the town of Kennan and Catawba in Price County. Improvements also include replacing six cross-culverts, curb ramp replacements, evaluation of guard rail for replacement, concrete deck overlay of structure B-50-0029 over the North Fork Jump River, replacement of concrete box culvert C-50-1968. Railroad coordination may be required for paving side roads within project limits. It is assumed real estate acquisition will be required from six parcels for curb ramps, and the consultant will be responsible for preparing TPP and performing any supplemental survey and wetland delineations for culvert replacements and soil borings for structure replacement.