Specifications include, but are not limited to: The WORK consists of the following: The construction of the Wastewater Treatment Plant- Phase I including but not limited to site work (vegetation stripping, yard piping, grading & drainage, & all-weather access road), new concrete structures (treatment basin, disinfection basin, & cloth filter basin), sodium hypochlorite disinfection system and fiberglass building with foundation. electrical system and instrumentation, auto dialer, a manual power transfer switch. The facility will be encompassed by an 8-foot tall security fence. Contractor will be responsible for obtaining, installing, and constructing all materials per plans and specifications to provide a fully functional and operational wastewater treatment plant.