Specifications include, but are not limited to: Curtis Hall, is the only residence hall at Maine Maritime Academy, and requires extensive building system repairs and upgrades. The proposed scope of work includes, but is not limited to, upgrades of mechanical, plumbing, electrical, fire protection and heating systems as well as the building windows and some exterior work. The 159,000 square foot building, constructed in three phases between 1969 and 1973, at maximum capacity houses approximately 650 students in 315 rooms. The first floor primarily consists of Administrative Offices providing a range of student and health services. The ground floor contains the Academy’s Bookstore and utility rooms. The building will remain in service during renovations, and construction will be conducted in 4 phases, allowing for construction in one vacant phase at a time.