Specifications include, but are not limited to: 1 2" Hot In Place Asphalt - 26'-0" wide 317.00 Sta. $0.00 2 2" Hot In Place Emulsified Asphalt HIP- Oil 54,939.00 Gal. $0.00 3 Asphaltic Concrete, "SLX" - (1½") 8,516.00 Tons $0.00 4 Asphaltic Concrete, "SPR" - Trench (3'-0" wide) 8,852.00 Tons $0.00 5 Cold Milling, Class 3 3,257.00 Sq.Yds. $0.00 6 Tack Coat 11,238.00 Gal. $0.00 7 Asphaltic Concrete For Patching, Type SPR 100.00 Tons $0.00 8 Preparation Of Intersections And Driveways 2,191.00 Sq. Yds. $0.00 9 Rental of Skid Loader, Fully Operated 12.00 Hour $0.00 10 Rental of Dump Truck, Fully Operated 12.00 Hour $0.00 11 Rental of Cold Mill Head, Fully Operated - (Patching) 12.00 Hour $0.00 12 Asphalt Trenched Widening - 3'-0" wide 622.00 Sta. $0.00 13 Edgeline Rumble Strips 622.00 Sta. $0.00 14 Centerline Rumble Strips 318.00 Sta. $0.00 15 Traffic Grabber Cones 7,814.00 ConeDays $0.00 16 Furnishing And Operating Pilot Vehicle 34.00 Days $0.00 17 Flagging 74.00 Days $0.00 18 Temporary Sign Day 340.00 SignDay $0.00 19 Barricades, Type III 960.00 BarrDay $0.00 20 Construction Signs 840.00 Sign Day $0.00 21 5" Permanent Pavement Marking Paint 18.00 Miles $0.00 22 Railroad Crossing Symbol, Wet Reflective Preformed Permanent Pavement Marking-Grooved 2.00 Each $0.00 23 24" White Wet Reflective Preformed Permanent Pavement Marking, Type 4-Grooved 2.00 Each $0.00 24 Earth Shoulder Construction 637.00 Sta. $0.00 25 Seeding, Type "B" 9.00 Acres $0.00 26 Mulch 18.00 Tons $0.00 27 Crushed Rock Surface Course 195.00 Tons $0.00