Specifications include, but are not limited to: Complete paint removal, encapsulation, enclosure, and/or whole component removal of lead-based paint hazards as identified in the lead based-paint inspection report. Floors: • Enclosure: Prepare surface by removing any obstructions and repair damage for attaching the new enclosure. New Floor shall be installed starting with 1/4” Luan underlayment or approved equal and floor leveler to fill all seams and fastener holes to prevent dust migration and prepare the surface. Floating floor panels or VCT Tiles to be installed per manufacturers’ recommendations for finished floor. Materials and colors to be agreed upon by owner in writing and noted on the design specifications. Subject to Maine DEP Enclosure Method (Chapter 424 Section 6.C.4) Baseboards: • Remove and Replace: Remove and dispose of the component(s) to clear the hazard. (May require a building permit with drawings.) Repair any unfinished surface to meet interior or exterior exposure as needed. Subject to Maine DEP Component Removal Method (Chapter 424 Section 6.C.5) Ceilings: • Remove and Replace (to include roof): Remove and dispose of the component(s) to clear the hazard. (May requires a building permit with drawings.) Repair any unfinished surface to meet interior or exterior exposure as needed. Remove Existing roof framing and decking. Install new roof framing and sheathing per code. Install roof fascia and drip edge. Cover with approved roofing. New roofing material shall have a minimum 25-year manufacturer’s guarantee. Interior Openings: Install framing as needed. Insulate the cavity and install 5/8” fire-rated sheetrock each side of the opening. Mud & Tape 3 coats. Surfaces shall be finished. (2 coats of stain or primed and painted 2 finish coats, if required). Subject to ME DEP Component Removal Method (Chapter 424 Section 6.C.5)