Specifications include, but are not limited to: a. Clean Up: Upon suspension or completion of the work, the Contractor shall remove all materials, equipment and rubbish and shall leave the premises in a neat and orderly condition. b. Control of Location Points: All layout work shall be the responsibility of the Contractor and the Contractor shall also be responsible for establishing location points of solid or center lines in accordance with State Traffic Commission Regulations. Any special situations shall be referred to the Supervisor for instructions. Guidelines shall meet all pedestrian crosswalk lines and not cross them. At intersections which do not have pedestrian crosswalks marked, the Contractor shall stop his markings at points designated or as ordered by the Supervisor. c. Protection of the Line: The Contractor shall furnish all guards or forms of protection of approved design to protect the markings from all traffic until it is hard dry to no pickup and suitable for use. The Contractor shall use every precaution to protect newly painted lines from tracking, and to prevent spilling of paint on the pavement. To supplement the line guards, should the Supervisor deem it necessary, the services of a uniformed town police officer or officers will be requested from the Police Department. d. Traffic Control Work: As markings are to be applied on heavily traveled streets, the proper handling of traffic is a major consideration. Traffic shall not be impeded and work shall be carried out in such locations and at such times and sections as the Supervisor may direct. All work must be done with a minimum of inconvenience to the general public. In areas of high traffic volume, the work may have to be done during off-peak hours, including evening/weekend hours.