Specifications include, but are not limited to: The Public Works Complex scope includes construction of a new, 2-story, 7,000 GSF Administration Building connected to an 8,320 GSF Shop / Storage Building. A Sand/Salt Storage space is incorporated, and a Truck Wash is identified as an Add Alternate. A Fuel Island and Vehicle Storage Building are planned as a Phase II scope (future project). The Admin/Shop building is constructed on standard spread concrete footings and foundation walls, slab on grade and a combination of steel columns & beams, braced frames, concrete & CMU walls and open-web joists & girders. Exterior cladding includes slate shingles, extruded aluminum cladding with a faux-wood treatment, and single-skin extruded aluminum panels of varying profiles. A single-ply roof membrane encloses the roof. For the Sand/Salt Storage and Truck Wash, concrete and CMU are the primary structural components with open-web joists and metal roof deck.