Specifications include, but are not limited to: The Project includes the following work and will be awarded as separate contracts (therefore, bidders are not obligated to submit bids on all schedules): Schedule 1, Chlorination and Filtration System which include the addition of chlorination and filtration equipment to the existing building and connected to the well line. Schedule 2, Site Improvements which includes repair of drain lines, constructing a concrete headwall to create an air gap for the overflow line, and cleaning of the existing water tank. Schedule 3, SCADA Upgrades, which includes configuring the existing SCADA panel for new equipment and setup to communicate with Duchesne County Water Conservancy District’s (DCWCD) existing system.