Specifications include, but are not limited to: The existing administration and nurse’s suite will be reconfigured to comply with the current PSFA Adequacy Standards. The existing school’s water lines will be inspected and removed or abandoned in place, as necessary, and replaced with new lines. The sewer lines will be removed or abandoned in place as required for the new renovations. Instant hot water heaters will be installed where required. New ceiling tiles will be replaced per the Clovis District Standards. All electrical light fixtures will be replaced with LED fixtures. The existing walls will be re-painted using District standard colors. All doors and windows will be replaced with energy efficient glazing. Door hardware will be inspected and replaced/repaired as necessary. The existing school’s flooring will be removed and a polished concrete floor will be provided. The Multi-purpose will have new flooring appropriate for physical activities. The infrastructure for electrical will be updated. The low voltage for the school will also be replaced. The Fire alarm system will be upgraded to conform to the Phase I Fire Alarm system. Asbestos abatement will be procured under a separate contract by the Owners. The exterior improvements will be to provide a new bus loop pick up/drop off on the south side of the school. Removal and replacement of all playground surfaces as well as removal and replacement of all concrete playground surfaces.