Specifications include, but are not limited to: 1) Install various low voltage systems. Intercom, ERB (Emergency Response Button), Access Control, Intrusion, Network backbone and Ip cameras. All devices and cable will be provided by the School District. 2) Install provided open Network rack for new IDF in room 126. Install 12 strand Corning single mode fiber from MDF to new IDF. MSD to provide racks, patch panels and cable management. 3) Install, terminate and test provided Corning 12 strand armored single mode fiber. Boxes, raceway support and other materials for low voltage cabling will be supplied by the district. 4) Fiber will be of fusion type termination. 5) Install components to Medford School District and Manufacture specifications. 6) Any deviations from the plans must be approved by the owner. Any deviations will be reflected on the drawing for as-built. 7) Testing shall include fiber strand designation from MDF to IDF.