Specifications include, but are not limited to: • Mobilization and Demobilization • Survey and Construction Layout • Installation and Maintenance of Erosion and Sediment (E&S) Controls • Access and Parking Lot Construction • Quality Control • Site Preparation, including Clearing and Grubbing • Unclassified Excavation / Regrading / Soil Drying • Traffic Control, where required • Construction of Lime Silo, Control Building, and Reinforced Concrete Foundations, and remote pH monitoring stations • Potable Water Line Construction • Stream Bank Stabilization • Demolition of Existing Lime Silo and Treatment System • Revegetation • Final Site Cleanup and Removal of E&S Controls • Asphalt Paving (to be added by others after completion of this project)