Specifications include, but are not limited to: 2.1 Contractor shall repair chain link fencing to pre-storm conditions where needed. The perimeter fencing has been divided into 22 sections as indicated in the table below and on the attached aerial photo with fence drawing. Contractor shall be responsible for all measurements. Section Number Work to be performed: 1 New chainlink, barbed wire, some new posts 2 Tighten barbed wire, top and bottom tension wires 3 Tighten barbed wire, top and bottom tension wires 4 Tighten barbed wire, top and bottom tension wires 5 Tighten barbed wire, top and bottom tension wires 6 Tighten barbed wire, top and bottom tension wires 7 Tighten barbed wire, top and bottom tension wires 8 Tighten barbed wire, top and bottom tension wires 9 Tighten barbed wire, top and bottom tension wires 10 No repairs needed 11 New barbed wire and tension wires 12 New barbed wire and tension wires 13 New barbed wire 14 Tighten barbed wire, top and bottom tension wires 15 Tighten barbed wire, top and bottom tension wires 16 Tighten barbed wire, top and bottom tension wires 17 New chainlink, barbed wire, posts 18 No repairs needed 19 New chainlink, barbed wire, posts 20 No repairs needed 21 No repairs needed 22 Tighten barbed wire 2.2 Contractor shall replace or tighten the three rows of barbed wire atop the chain link fencing, as needed. 2.3 Contractor is responsible for the removal of all vegetation on the fence in the project areas. 2.4 Standard galvanized steel fencing shall be used. 2.5 All work shall be in accordance with Statewide Urban Design and Specifications (SUDAS), current version (link below). If there is a discrepancy between SUDAS and the City’s bid documents, the bid documents take precedence. http://www.cedar-rapids.org/local_government/departments_g_- _v/public_works/sudas_statewide_urban_design_and_specifications.php