Specifications include, but are not limited to: • The abatement and demolition of the entire structure including foundations, floor slabs and sidewalks. All demolition materials will be disposed of offsite. • Foundation voids will be backfilled with clean imported fill, top dressed in loam and seeded. • Foundation voids are assumed to be relatively minor as the structure does not have subsurface levels. • Utility disconnects will be required as per contract documents, including necessary street restoration. • Erosion controls will be installed and maintained as necessary during site activities. • Existing fire hydrant(s) located on Silver Lane may be used for the supply of water required during demolition. • The Town of East Hartford will obtain all necessary municipal approvals and waive any permit fees required for work directly or indirectly associated with the demolition of the structure. • Restoration including grading, topsoil, seed, hay (water/establish). • Demolish, remove & dispose of existing site finishes (where shown on construction documents) including but not limited to asphalt, concrete, sidewalks, ramps, pads, bollards, fencing, signage, etc., within twenty feet of the face of building and/or as necessary and required to remove the building and its foundation.