Specifications include, but are not limited to: The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary to remove and dispose of old gates and install new ones. Remove & dispose of existing, and install a new gate & 4 posts at Old Marine Trail North Install a new gate & 4 posts at Savanna Campground after loop #1 Remove & dispose of existing, and install a new gate & 4 posts at Ball Field Gate Remove & dispose of existing, and install a new gate & 3 posts at Broadway Parking Lot Remove & dispose of existing, and install a new gate & 4 posts at Ballfield Trail Gate #5 Install a new gate & 4 posts at Overflow Parking Lot Remove & dispose of existing, and install a new gate & 4 posts at Wedge Hill Group Camp Install a new gate & 4 posts at Savanna Campground Road Remove & dispose of existing, and install a new gate & 3 posts at Old Park Office Posts & Quickcrete are provided by the State Park. o The concrete is available this fall, so may not be useable if spring installation is required. Posts must be 4 feet in the ground. When pouring the concrete footer, the hollow steel posts will need to be filled with concrete.