Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 4 020100 1.000 LS CONTRACTOR CONSTRUCTION STAKING / 5 012340 1.000 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 6 025200 1.000 LS REMOVAL OF EXISTING STRUCTURES / 7 025324 1.000 LS TRAFFIC CONTROL / 8 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / Section 01 Total $70.00 Section 02 ROAD ITEMS 9 025361 1.000 LS CLEARING AND GRUBBING / 10 060359 1.000 LS CLEANING EXISTING STRUCTURE / 11 012410 8045.000 CUYD COMMON EXCAVATION (RURAL SMALL) / 12 012332 4725.000 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) / 13 010114 1.000 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 14 051101 10.000 LNFT CROSS ROAD PIPE ( 36") (RCP) / 15 051201 15.000 LNFT CROSS ROAD PIPE ( 42") (RCP) / 16 054701 1.000 EACH END SECTION ( 36") (RC) / 17 054726 1.000 EACH END SECTION ( 42") (RC) / 18 011590 1.000 CUYD $50.000 $50.00 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) / 19 025320 11.000 EACH MONUMENT BOX / 20 023447 912.500 LNFT GUARDRAIL, STEEL PLATE / 21 023411 17.000 EACH GUARDRAIL END TERMINAL (SKT) /