Specifications include, but are not limited to: PART A-1: SANITARY SEWER IMPROVEMENTS – PHASE 1 – RES. NO. 30-2023 1 8,392 LF 8" Sanitary Sewer Pipe 2 30 EA Standard Manhole (4' Diameter) 3 5 EA Shallow Manhole (4' Diameter) 4 79 EA 8" x 4" Tee & Riser 5 49 EA 4" Stub w/ Riser 6 379 LF Flowable Fill 7 2,462 LF Sand Backfill Flushed & Vibrated 8 1 LS Temporary Seeding 9 1 LS Seeding & Erosion Control 10 1 LS Site Clearing & Restoration PART A-2: SANITARY SEWER IMPROVEMENTS – PHASE 1 – RES. NO. 34-2023 11 1,009 LF 8" Sanitary Sewer Pipe 12 4 EA Standard Manhole (4' Diameter) 13 1 LS Temporary Seeding 14 1 LS Seeding & Erosion Control 15 1 LS Site Clearing & Restoration PART B: STORMWATER DRAIN IMPROVEMENTS – PHASE 1 – RES. NO. 32-2023 16 1 LS Mass Grading 17 125,909 CY Excavation 18 1,971 LF 15" SWS Pipe 19 638 LF 18" SWS Pipe 20 532 LF 24" SWS Pipe 21 119 LF 30" SWS Pipe 22 539 LF 36" SWS Pipe 23 483 LF 42" SWS Pipe