Specifications include, but are not limited to: Three (3) culvert rehabilitations addressing priority maintenance items of the existing structures carrying SR 0080 traffic over Oley Creek with approach roadway improvements. Rehabilitation items for the existing concrete culvert structures include spall repairs, epoxy injection crack sealing, debris removal, wingwall repairs, and scour protection. Additional work includes excavation, access road construction, shoulder work of culvert approaches, E & S control measures, guide rail and right-of-way fence replacement, rumble strips, pavement markings, permanent signing, and other miscellaneous construction work as necessary. Traffic will be accommodated using long term lane shifts to complete staged construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0080, SECTION P01, STATE ROUTE 0080, SECTION P02 and STATE ROUTE 0080, SECTION P03 in LUZERNE COUNTY, DENNISON & FOSTER TOWNSHIPS. The location of the SR 0080-P01 project runs from a point approximately 4.8 miles East of SR 0309 Interchange Exit #262 at Segment 2671 Offset 1528 (Station 1049+75.00 WB) to a point at Segment 2675 Offset 0646 (Station 1069+59.00 WB), with a total work area length of 1784.00 feet (0.338 miles). The location of the SR 0080-P02 project runs from a point approximately 5.0 miles East of SR 0309 Interchange Exit #262 at Segment 2670 Offset 2281 (Station 1062+25.00 EB) to a point at Segment 2674 Offset 1666 (Station 1082+50.00 EB), with a total work area length of 1825.00 feet (0.346 miles). The location of the SR 0080-P03 project runs from a point approximately 8.2 miles East of SR 0309 Interchange Exit #262 at Segment 2704 Offset 2419 (Station 1248+07.00 EB) to a point at Segment 2710 Offset 1928 (Station 1268+25.00 EB), with a total work area length of 1818.00 feet (0.344 miles).