Specifications include, but are not limited to: The project consists of rehabilitation of a stone arch culvert addressing priority maintenance items of the existing structure carrying SR 0415 traffic over Harvey's Creek. Rehabilitation items for the existing structure include concrete underpinning, Type A repointing including grouting of voids, debris removal, and spall repairs. Additional work includes excavation, access road construction, E & S control measures, and other miscellaneous construction work as necessary. Traffic will be accommodated using short term lane closures as needed to complete construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0415, SECTION P60, in LUZERNE COUNTY, HARVEY"S LAKE BOROUGH. The location of the SR 0415-P60 project begins at a point on SR 415 approximately 7.87 miles West of the SR 0309 / SR 415 intersection at Segment 0170 Offset 1204 (Station 1072+52.40) to a point at Segment 0170 Offset 1538 (Station 1075+85.72), with a total work area length of 133.32 feet (0.025 miles).