Specifications include, but are not limited to: The work consists of the construction of 17 acre baseball field complex includes the following amenities; four baseball fields with synthetic turf outfields and dirt infields, covered dugouts, bullpens, digital scoreboards, covered bleachers, a single adaptive use field with synthetic turf, chain link fencing, playground equipment, a fabric shade structure, a prefabricated restroom, a synthetic turf warm-up area, an asphalt parking lot, concrete sidewalks and plaza space, metal shade structures, CMU enclosures, and LED site and sports lighting. The work also includes a maintenance yard with CMU wall, a 1,600 sf maintenance building, and a wash rack. The site work consists of construction through undeveloped land through the means of clear and grub, rough grade, cut, over-excavation, haul, import fill, fine grade, dust control and caliche removal.