Specifications include, but are not limited to: The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents for the listed project in accordance with INDOTs designated letting schedule. The selected firm will also be responsible for: Environmental Document (CE), Permit Applications, Topographic Survey, Geotechnical Engineering, Roadway and MOT Design and Plan Development, Small Structure and Pipe Hydraulic Design, Utility Coordination, Pavement Design, and construction phase services. INDOT is expected to perform the railroad coordination. Other services such as Ecological Surveys, Wetland Mitigation, Archeological investigations, Historical/Architectural investigations, and Subsurface Utility Exploration (SUE) may be included later if these work types become necessary. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected firms fee proposal shall be due 45 calendar days after the selection date for this RFP item.