Specifications include, but are not limited to: (a) design and installation of energy efficient equipment and systems which will reduce energy consumption associated with all HVAC systems, boiler systems, building envelope, lighting, domestic hot and chilled water production plus other energy using systems, (b) maintenance plan(s) for HVAC mechanical equipment and installed systems, (c) retrofit of existing systems, (d) training of existing Airport personnel in the operation and maintenance of existing and new equipment installed under the project, (e) complete energy audits of systems and infrastructure, (f) monitoring of energy costs campus wide, (g) financing for the project, (h) support the program with available funding grants and utility rebates (i) a written guarantee that total program costs will be 100% covered through existing budgets and or additional revenues generated by the project.