Specifications include, but are not limited to: Projects may include airport planning and environmental services and design and constructionadministration. Projects will be accomplished over the course of five (5) years over multiple grants.Projects will be largely based on, but not limited to, the most current CIP for the Airport. Projectsanticipated to be completed within the next five (5) years include:•Airfield lighting replacement, including edge, threshold, PAPI, REIL, and airfield beacon.•Obstruction removal•Miscellaneous vehicle and equipment purchase with an emphasis on snow removal equipment(SRE) and fuel truck vehicles•Arrival/Departure Building rehabilitation•Seaplane base rehabilitation, extension, replacement, or repair, to include ramp and dock•Taxiway and apron rehabilitation/reconstruction•Building area expansion, including environmental, design, taxilanes, and hangar development.•Guidance signs and surface painted hold signs•Routine crack repair and sealing of all airfield pavement,•Fuel system replacement•Necessary environmental determinations, including environmental assessments for projectsidentified on CIP