Specifications include, but are not limited to: PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS: ROADWAY ITEMS: MOBILIZATION LUMP SUM LS; CLEARING AND GRUBBING LUMP SUM LS; REMOVAL OF BRIDGE AT STATION 231+47 1.000 UN; REMOVAL OF PAVEMENT 1,350.000 SY; UNCLASSIFIED EXCAVATION (FM) 160.000 CY; BORROW EXCAVATION (F.M.E.) 105.000 CY; (CONTRACTOR FURNISHED) (CLASS 7); CHANNEL EXCAVATION (FM) 170.000 CY; GRANULAR MATERIAL (LVM) 100.000 CY; (CLASS 9, GROUP B) CRUSHED STONE, 610 1,510.000 TON; HOT MIX ASPHALT, ST 9.5MM 122.000 TON; HOT MIX ASPHALT, ST 12.5MM 213.000 TON; ASPHALT FOR PRIME COAT (EA-1) 542.000 GAL; CLASS "B" STRUCTURAL CONCRETE, 0.126 CY; MINOR STRUCTURES: 18" REINFORCED CONCRETE PIPE, 32.000 LF; CLASS III: 18" REINFORCED CONCRETE PIPE, 2.000 EA