Specifications include, but are not limited to: 1. Selective demolition of existing facilities 2. Field realignment and reconstruction to meet NCAA standards. Field will be moved to the south (towards Iowa Street). 3. Installation of artificial turf at infield, outfield and bull pens. Project includes new grading and drainage systems 4. Construction of new pre-fabricated bleachers to seat approximately 500 fans. Bleacher system to be ADA compliant and include a new press box (approximately 200 square feet). 5. Construction of new dugouts. 6. Construction of new restroom and concessions facilities (new buildings) 7. Re-purpose the existing public toilet rooms into an officials’ prep room. 8. New fencing (Including backstops, outfield fences and perimeter security fencing). 9. New welcoming entry plaza -possibly including architectural concrete, brick pavers and an entry gate. 10. New concrete circulation walkways. 11. New field lighting and site safety lighting 12. New scoreboard. 13. New sound system 14. Irrigation and landscaping. 15. Possible batting cages and golf practice facilities beyond the outfield fences (Design Alternate)