Specifications include, but are not limited to: • Design and construction of multi-use pathways and walking trails • Design and construction of multi-use path, lighting, and trail amenities • Engineering for federal, state, and local trails and roadways • Roadway design and construction • Drainage design and construction • On-call engineering services necessary for providing emergency/disaster operations, damage and repair assessment and emergency recovery engineering services • Preliminary and final engineering studies, environmental, historical reports, preliminary and final design services • Provide engineering and technical assistance (project evaluations, field inspections and investigations, analysis, recommendation, system design, cost and time estimates, testing, reports, studies, etc.) to other professional, design and assessment services • Provide quality control and assurance services relating to the review of project and system design documents, specifications, recommendations, and cost estimates prepared by others • Sub-surface investigation • System assessment, material condition review, reliability analysis, testing, and design services • Emergency operations, damage and repair assessment and recovery engineering services to include engineering, planning, and surveying services; environmental investigations; architectural and landscape design services; as well as administration of FEMA/FHWA projects, debris reduction contracts and debris removal contracts. • Provide the required engineering, observation, inspection, testing, and support services during the construction and/or renovation of new or existing infrastructure, facilities, buildings and building systems to ensure compliance and adherence to construction project documents. Project Phase: Each individual project’s scope of work performed will be subject to the Participating Entity engaging, assessing, evaluating, selecting, and negotiating with the Offeror that possesses the qualifications, background, experience, attributes, and resources that best fit their project’s goals, objectives, and outcomes, and to assist them in developing, implementing, executing, conducting, and completing the identified project in the most cost effective and timely manner. The project phases may include, but are not limited to: • Programming phase; • Conceptual design and alignment studies; • Schematic design phase; • Design development phase; • Construction documents phase; • Procurement and/or bidding phase; • Construction phase; • Project acceptance and close-out; • Project 11-month warranty phase Post Construction: • Completing all project documentation including, but not limited to, change order summary, final detail estimate, project acceptance documentation, and claims management/resolution • Finalize all project documents for NMDOT, FHWA, and Village or Ruidoso review and inspection • Preparing a final construction project report as required by NMDOT and FHWA Guidelines