Specifications include, but are not limited to: Interior Six mil plastic will cover the complete floor in the work areas and be taped completely to the baseboard prior to starting any work. After lead hazard reduction work is completed, roll plastic inward so all paint chips and debris are sealed in the plastic, tape closed and place in 6 mil plastic bag and tape shut. HEPA vacuum work area after plastic is removed. Cover all heating duct vents, as needed.; Exterior Containment is required to collect all paint chips and dust that disturbed during the exterior work. All windows and entrance doors must be covered with plastic, until all surfaces on that side are prepared for painting and primed.; After the surface preparations and abatement are complete, un-tape the plastic from the adjacent surfaces and roll inward or collapse so all paint chips and debris are sealed in the plastic. Tape the rolled plastic closed with duct tape and dispose of in six mil plastic bag. Hepa vacuum any paint chips on the ground that were not captured by the plastic.; No person will enter or remain in a work area at any time during this project except the owner, or his agent, certified workers, enforcement officials, their designees, or the lead project/planner. People other than those listed above may enter the work area only after the area has been clean-up and vacuumed with a HEPA vacuum.