Specifications include, but are not limited to: 0010 0201001 CLEARING AND GRUBBING LUMP SUM _______________.____ 1.000 _______________.____ 0020 0202000 EARTH EXCAVATION c.y. 1,127.000 _______________.____ _______________.____ 0030 0202529 CUT BITUMINOUS CONCRETE PAVEMENT l.f. 83.000 _______________.____ _______________.____ 0040 0203202 STRUCTURE EXCAVATIONEARTH (EXCLUDING COFFERDAM AND DEWATERING) c.y. 623.000 _______________.____ _______________.____ 0050 0204001 COFFERDAM AND DEWATERING l.f. 237.000 _______________.____ _______________.____ 0060 0204139 COFFERDAM MATERIAL LEFT IN PLACE l.f. 237.000 _______________.____ _______________.____ 0070 0207000 BORROW c.y. 131.000 _______________.____ _______________.____ 0080 0209001 FORMATION OF SUBGRADE s.y. 2,180.000 _______________.____ _______________.____ 0090 0210306 TURBIDITY CONTROL CURTAINS ** See Special Provisions ** l.f. 248.000 _______________.____ _______________.____ 0100 0210821 WATER POLLUTION CONTROL ** See Special Provisions ** est. 3,000.000 _______________.____ _______________.____ 0110 0212000 SUBBASE c.y. 767.000