Specifications include, but are not limited to: SP-9 Mobilization 1.00 Lump Sum $0.00 SP-10 Storm Water Pollution Prevention Plan 1.00 Lump Sum $0.00 SP-11 Clearing and Grubbing 0.70 Acre $0.00 SP-13 Excavation 4,303.00 Cu.Yds. $0.00 SP-14 Fill 289.00 Cu.Yds. $0.00 SP-15 D90 = 24" Rock Grade Control 279.00 Cu.Yds. $0.00 SP-16 D90 = 24" Rock Stilling Basin 171.00 Cu.Yds. $0.00 SP-17 Step Grade Control 68.00 Cu.Yds. $0.00 SP-18 D90 = 24" Rock Toe Protection 517.00 Cu.Yds. $0.00 SP-19 D90 = 12" Rock Slope with 6" Soil Cap 958.00 Cu.Yds. $0.00 SP-20 Vegetated Rock Swale 116.00 Cu.Yds. $0.00 SP-21 4" Thick Granular Backfill 331.00 Cu.Yds. $0.00 SP-22 Fabric and Wattle Slope 471.00 Sq. Yds. $0.00 SP-23 Wattle Log for Vegetated Fabric and Wattle Slope 644.00 Lin. Ft. $0.00 SP-24 36" Step Grade Control Boulders 207.00 Each $0.00 SP-25 24" RCP Storm Pipe 57.00 Lin. Ft. $0.00 SP-26 48" RCP Storm Pipe 3.00 Lin. Ft. $0.00 SP-27 24" Flared End Section 1.00 Each $0.00 SP-28 48" Flared End Section 1.00 Each $0.00 SP-29 Manhole 1.00 Each $0.00 SP-30 Restoration Seeding 3.00 Acre $0.00 SP-31 Construction Staking 1.00 Lump Sum $0.00 SP-32 AS-Built Survey 1.00 Lump Sum $0.00