Specifications include, but are not limited to: Removal of existing sidewalks Removal of existing granite curbing and installation of new granite curbing, tipping down at intersections and driveways to pavement. Concrete poured front and back. Removal of existing light poles and pedestals. Install Sono tubes and conduit for new light poles and pedestals. Install planter boxes (See attached design) Install Key Ring Bike Racks Install needed gravel and fine grade for concrete. NHAA 4000 PSI Fiber Concrete 4” thick Patch pave any disturbed area for curb installation. Install truncated domes at each road crossing and crosswalk location. (24”x30” iron, set in concrete) Remove existing brick in two islands on Sullivan Street and pour 4000 PSI Fiber Concrete 6” thick Refer to Plans for details This proposal requires the selected firm to: Provide one (1) bid for lump sum project. Provide one (1) project pricing sheet for possible additional work. Provide proper traffic control if needed in coordination with DPW, CPD, & CFD. Provide pre-notification to the Department of Public Works one (1) week prior to start of construction.