Specifications include, but are not limited to: 0001 * 2010-B Clearing and Grubbing AC 0.66 $___________ $_____________ 0002 * 2010-A Clearing and Grubbing UNITS 6.50 $___________ $_____________ 0003 * 2010-E Excavation, Class 10, On-Site CY 67.00 $___________ $_____________ 0004 * 2010-E Excavation, Class 10, Waste CY 253.00 $___________ $_____________ 0005 * 2010-E Excavation, Class 10, Import CY 1654.00 $___________ $_____________ 0006 * 2010-F Below Grade Excavation (Core Out) CY 375.00 $___________ $_____________ 0007 * 2010-G Subgrade Preparation SY 1272.00 $___________ $_____________ 0008 * 2010-H Granular Stabilization TON 687.00 $___________ $_____________ 0009 * 2010-I Subgrade Treatment, Geogrid, Type 2 SY 1220.00 $___________ $_____________ 0010 * 2010-J Subbase, Modified Subbase, 6 In SY 1220.00 $___________ $_____________ 0011 * 2010-K-1 Removal of Pipe Apron EA 1.00 $___________ $_____________ 0012 4020-A-1 Storm Sewer, RCP, Trenched, 15 In LF 19.00 $___________ $_____________ 0013 4020-A-1 Storm Sewer, RCP, Trenched, 18 In LF 66.00 $___________ $_____________ 0014 4020-A-1 Storm Sewer, Polypropylene, Trenched, 18 In LF 24.00 $___________ $_____________ 0015 4020-A-1 Storm Sewer, RCP, Trenched, 24 In LF 155.00 $___________ $_____________ 0016 4020-A-1 Storm Sewer, Polypropylene, Trenched, 24 In LF 88.00 $___________ $_____________ 0017 * 4020-D Removal of Storm Sewer LF 188.00 $___________ $_____________ 0018 * 4020-G Storm Sewer Abandonment, Fill and Plug LF 70.00