Specifications include, but are not limited to: Grading and Site Prep Cubic Yard $ $ $ $ $ Shelter, includes setting, anchoring to pad and grounding Each $ $ $ $ $ Aggregate Per Ton $ $ $ $ $ Pad, excavating forming and pouring Each $ $ $ $ $ Concrete Cubic Yard $ $ $ $ $ Fencing includes fabric, posts, three strands of barbed wire and all hardware. Lineal Foot $ $ $ $ $ Waveguide bridge furnished and installed Per lineal foot $ $ $ $ $ Excavation of rock if required Hour $ $ $ $ $ Mileage Additive Rate from above Per Mile $ $ $ $ $ Generator-Transfer switch cost* Lump Sum $ $ $ $ $ 500-gallon propane tank* Lump Sum $ $ $ $ $ Freight for Generator / Shelter FOB Salina Lump Sum $ $ $ $ $ Trenching for conduit Lineal Foot $ $ $ $ $ Electrical Service Upgrades Lump Sum Cost + % Cost + % Cost + % Cost + % Cost + % General Labor For Other Services Man Hour $ $ $ $ $