Specifications include, but are not limited to: 1) Group Camp Assembly Hall - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-foot of roof edge, drip edge, valleys, plumbing boots and lay new architectural shingles with no valleys to be seen. c. Replace damaged porch ceiling with like materials. d. Replace all soffit, fascia with new Cedar Texture Engineered Treated wood boards. All cuts shall be primed and painted with High Quality 100% Acrylic paint before installing. A minimum 3/16-inches should be left between joints. e. Replace damaged downspout with like materials. f. Install new hinges and door closers on all exterior doors to match existing. g. Repair damaged siding on front of building with like materials. h. Pressure wash structure and allow at least 48 hours to dry before caulking or painting. i. Caulk as required, prime and paint all siding and trim with two coats of paint with colors to be chosen by Park Staff. 2) Group Camp Cabins 1-6 - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-foot of roof edge, drip edge, and lay new architectural shingles. c. Replace all windows with Low E, Energy Star rated vinyl windows to match existing. d. Install new hinges and door closers on all doors to match existing. e. Repair any damaged siding and trim with like materials. f. Pressure wash structures and allow at least 48 hours to dry before caulking or painting. g. Replace all soffit, fascia with new Cedar Texture Engineered Treated wood boards. All cuts to be primed and painted with High Quality 100% Acrylic paint before installing. h. Caulk as required, prime and paint all trim and siding with two coats of paint with colors to be chosen by Park Staff. 3) Group Camp Shelter - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-foot of roof edge, drip edge, Electrical Mast Roof Flashing, and lay new architectural shingles.