Specifications include, but are not limited to: This work shall include all labor, equipment, and materials necessary to connect to the existing electrical facility and construct new illumination system at the locations as indicated in the Contract Documents. Work shall include new conduits, junction boxes utility vaults, pull string, tracer wire, polyethylene film, directional boring, trenching, removal and replacement of existing concrete panels or other surfacing for intermediate bore pits or trenching operations, restoration of sprinkler systems, landscaping and all other components necessary to complete the system. It is the Contractor’s responsibility to be aware of the potential conflict with other underground utilities.