Specifications include, but are not limited to: 1) Class II Streamside Protection Zones (50 feet each side of streams) have been designated with PINK flagging. No equipment shall operate within these areas, except at locations approved by the FORESTER. 2) Appropriate cable/cable assisted yarding equipment required for one harvesting unit.. 3) Culvert installations; excavator required. Minor road reconstruction is also required. 4) Approx. 1.4 miles of light roadside brushing. 5) Slashing and excavator piling required. 6) Primary log lengths – 16’6”, 17’6”, 25’, 27’, 33’ and 35’. For redcedar 19’, 31’ and 37’6” are also acceptable. 7) Petroleum spill kits must be on site, maintaining leak-free equipment. 8) Portable toilet must be on site, utilized and serviced on a regular basis. 9) Restoration, including grass seeding of landings and roads.