Specifications include, but are not limited to: 1. THE SCOPE OF THIS PROJECT IS TO REPLACE THE EXISTING HORIZONTAL AND VERTICAL CABLING, SPLITTERS, AND ANTENNAS FOR THE UHF RADIO SYSTEM THROUGHOUT LEVELS LL2 - L10, AND L16. 2. THE HEADEND EQUIPMENT IS EXISTING AND WILL BE REUSED IN A NEW LOCATION. 3. GENERAL: a. EXTENSIVE FIELD DUE DILIGENCE WILL BE REQUIRED TO DETERMINE THE EXACT ROUTING OF THE HORIZONTAL CABLING AND IN SOME CASES THE EXACT LOCATION OF THE EXISTING ANTENNAS TO BE REMOVED. b. THE LOCATIONS OF THE PATHWAY AND ANTENNA LOCATIONS ARE THE BEST APPROXIMATION THAT COULD BE MADE THROUGH SEVERAL SITE WALKS AND ANALYSIS OF THE WALK TEST DATA PROVIDED. 4. EXISTING HEADEND: a. THE EXISTING HEADEND IS LOCATED ON L2 AS SHOWN ON SHEET TR-104-02, IN ROOM "ELECTRICAL 205B". b. THE HEADEND WILL NEED TO BE MOVED AT THE END OF THE NEW CABLING INSTALLATION TO L2 ROOM "LOW VOLTAGE ROOM 2A8", ALSO SHOWN ON SHEET TR-104-02. THE HEADEND EQUIPMENT WILL BE INSTALLED IN AN EXISTING RACK IN THE NEW LOCATION. c. FROM THE NEW HEADEND LOCATION, TWO (2) CAT6 CABLES ARE TO BE INSTALLED TO THE MASTER CONTROL ROOM FOR A CONNECTION TO TWO (2) REMOTE TONE UNITS. d. TWO (2) REMOTE TONE UNITS ARE REQUIRED TO BE INSTALLED IN THE MASTER CONTROL ROOM WITH CROSS MUTING CAPABILITY AND THE ABILITY TO INTERFACE WITH THE OWNER'S MDC-1200 OVERLAY FOR CALL ID LOGGING.