Specifications include, but are not limited to: A. Conditions: 1. All work shall be completed in a workman-like manner according to standard practices. 2. Any alteration or deviation due to unforeseen conditions will be addressed through a change order prior to commencing work. 3. The contractor shall be responsible for all permit fees, labor, material; and taxes related to the installation of the new oil-fired boiler. 4. The new gas-fired boiler shall be installed in compliance with all state, local, and federal codes pertaining to the installation of the proposed system. 5. Contractor accepts responsibility of all the work associated with the removal and installation of the specified new oil-fired boiler. B. Procedures: 1. Remove existing boiler, including necessary piping and wiring and dispose of properly as required by the Town of Windsor. 2. Provide solid concrete masonry units to elevate new boiler a minimum of 4”. 3. Verify required size of boiler by performing a whole home heating load calculation. 4. Include as part of the replacement any failing boiler piping and components. 5. Clean and inspect masonry chimney flue prior to firing the new system. 6. Include all necessary electric line/low voltage work as required. 7. The contractor will be responsible for any additional access work, rigging or staging to complete the project. 8. Test and fire system and refer to specifications for additional information.