Specifications include, but are not limited to: 1) The contractor shall replace the main entrance door with a fully automatic opening door. This door shall be equipped with an accessible on off switch so security door can be closed. 2)The Contractor shall provide and install new LVT Flooring in the entire building, lobby, ranger offices, hallways, and bathrooms. 3)the contractor shall provide a 36 inch by 36-inch window by means of cutting block at marked location for parking lot viewing. The contractor shall install a double pane nonopening store front glass in this area. 4)The contractor shall paint the entire interior offices and lobby. All ceilings shall be painted. 5) The contractor shall replace lighting fixtures through out the interior. The ceiling fan shall be replaced with new park manager shall pick style. The area around the ceiling fan vaulted area shall have 4-foot LED strip lighting installed to illuminate area. 6)The contractor shall make sheet rock repairs in bathrooms including ceiling. Prime and paint with 2 coats of paint. 7)The contractor shall provide and install new plumbing fixtures including vanities, faucets, commodes, urinals, soap dispensers, and hand dryers. All fixtures shall be equipped with auto flush valves. The contractor shall also provide and install new partitions in the same footprint including doors. 8.The contractor shall be responsible for the demolition of two service counters in the lobby. One counter shall be replaced with a new counter of wooden appearance its design, dimensions, and placement shall be determined by park management. The flooring, walls, and other surfaces affected by the removal of the second counter shall be repaired to match the surrounding area. 9) The contractor shall prep trim by scrapping or pressure washing exterior building trim. The contractor shall calk any gap found and apply 2 coats of fresh paint. 10)The contractor shall replace building exterior lighting with LED like fixtures.