Specifications include, but are not limited to: Installation of stabilized construction access at multiple locations as shown on Drawings, complete in place and maintained during entire project. 6 Installation of SWPPP including silt fence (filter fabric fence), as shown on the Drawings, complete in place, maintained during entire project, and removed at final completion of project. Hydromulch Seeding for Erosion Control, Complete In Place. Care of Water for up to 65 MGD, including but not limited to control of ground, surface, and canal water or any other water encountered throughout the contract duration, complete in place. Grade canal and project site as shown on the Drawings, including canal reshaping, filling depressions and establishing grade around and between structures, topsoil, and compact all fill areas to 95% standard proctor density in applicable specified lifts. (Includes the import of fill material, if necessary). Installation of 18-inch thick broken concrete riprap (as specified) as shown in the Drawings, including geotextile, placement of material, grout with flowable fill, and any backfill necessary, complete in place. Installation of sheet piling (as specified) and as shown in the Drawings, complete in place. (includes formwork and supports as necessary).