Specifications include, but are not limited to: 1. Demolition a. Demolish and remove existing flooring, finishes, ceiling tiles, HVAC equipment, electrical outlets, lighting, etc. 2. Interior Finishes a. Provide and install new LVT flooring throughout the facility as needed. b. Provide and install new acoustic ceiling grid system (tiles and grid) throughout the facility as needed. c. Repair, patch, and paint all vertical walls and hard ceiling throughout the facility as needed. d. Prime and paint all wall and vertical surface. Paint shall be SW Pre-Catalyzed Water-based Epoxy Semi-Gloss or equivalent. e. Repair, patch, prime and paint existing ceiling grid. 3. Bathrooms and locker renovation a. Demo flooring, partition walls, vanities, toilets, sinks, and fixtures as needed in both men and women bathrooms. b. Provide and install new ceramic flooring with base trim for both bathrooms. Verify measurement in the field. c. Provide and replace existing partition with new ASI Global Solid Plastic (HDPE) or similar partition wall. (1) stall in both women and men’s bathroom must be ADA compliant and meets all ADA standards and specifications. d. Supply and install new toilets Kohler K-4368 Bowl with Sloan Regal 110 flushometer or similar as needed. e. Provide and install urinal Kohler K-4368 Bowl and Kohler k-5452-ET Urinal with Sloan Regal 110 flushometer or similar as needed. f. Provide and install Georgia-Pacific Marathon Toilet Tissue Dispensers or similar as needed. g. Provide and install Stainless Steel Sanitary Napkin Receptacle as needed. h. Provide and install toilet seat dispensers as needed. i. Provide and install Georgia-Pacific Pacific Blue Ultra Napkin Dispensers or similar as needed. j. Provide and install Commercial Hand Dryers comparable to ThinAir brand as needed. k. Provide and install Mirrors as needed. l. Provide and install surface Mounted hand sinks and faucets. Kohler Kingston K2007-0 or similar for the sink and DELTA Single Handle Center set Lavatory Faucet 501LF-HD or similar as needed. m. Repair, patch and prep all walls, ceiling, and vertical surfaces for a smooth finish specified to be painted. Verify measurement in the field. n. Prime and paint all walls, ceilings, and vertical surfaces. Paint shall be SW PreCatalyzed Water-based Epoxy Semi-Gloss or equivalent. Verify measurement in the field. o. Renovate existing locker rooms and install new ASI Global Solid Plastic (HDPE) lockers or similar. Based on Design and Build basis.