Specifications include, but are not limited to: Refer to the attached (draft) modified AIA B101-2017, Standard Form of Agreement Between Owner and Architect, which shall serve as the basis of the contract between the Owner and the Architect. The selected firm shall provide the necessary drawings for both the abatement of the existing flooring system as well as the installation of the new synthetic floor. The selected firm shall provide all associated specifications and bid package documentation required of the Environmental Consultant who will be overseeing the abatement of the existing mercury containing rubber flooring system. The selected firm shall provide all associated specifications and bid package documentation required of the Abatement and Demolition Contractor to remove the existing mercury containing rubber flooring system, inclusive of all necessary precautions and measures to the existing facility to ensure the public’s safety. The existing firm shall provide all associated specifications and bid package documentation required of the Contractor to install the new synthetic athletic floor system. The district is currently considering installing a new Robbins Pulastic Classic 110 Polyurethane Floor System. The bid package documentation shall include all associated surface line markings for the new flooring system as determined and verified by the owner and its representatives. A thorough review and confirmation of the required markings shall be carried out with the appropriate parties, as designated by the district, during the design phase. Note that the district participates in the Tools for Schools program, which the new flooring system is to comply with. Note that the project will be subject to Prevailing Wage Rates.