Specifications include, but are not limited to: The replacement (in kind) of a Garage and deck at existing location on site. Construction of 80 LF of Concrete Gravity wall 5 foot high with concrete swale ditch in front of wall. Replacement of 48" CMP pipe with RHDPE with slopped and flared headwalls. Construction of 120 LF of 24" HDPE, the re-construction of 850 LF of 2' flat bottom ditch to promote positive drainage. Installation of a Temporary Low water Crossing for access to existing haul road to re-construct 2' flat bottom ditch. Prior to beginning any major earth disturbance, all silt control measures will be installed. All areas disturbed by construction activities are to be revegetated in accordance with regional, regulatory, and project standards, using agricultural limestone, fertilizer, seed and mulch, as needed. All excavated material will be wasted on site. Any permits will be obtained prior to construction. No trees 3" diameter or more at breast height will be disturbed, with the exception of those in the slide and transition areas. No cave-like structures will be closed, and no cliff-lines will be disturbed.