Specifications include, but are not limited to: 1. Notify Project Coordinator (PC) within 24 hours of plugging commencement. 2. Install 24” cellar around well. 3. Pull 2” tubing. 4. Run in hole with work string, find total depth (TD). 5. Run 2 sacks of gel followed by 300’ bottom hole cement plug. 6. Tag plug. If cement top below 1400’, set cement plug to 1400’. Gas show. 7. Set cement plug from 1300’ to 1200’. Gas show. 8. Gel hole to 900’. 9. Set cement plug from 1100’ to 1000’. Gas show. 10. Set cement plug from 900’ to 800’ across elevation. 11. Pull 6 ⅝” casing. 12. Set cement plug from 800’ to 600’. 13. Gel hole to 200’. 14. Pull 8 ¼” casing. 15. Pull 10” casing. 16. Set cement plug 200’ to surface. 17. Set monument and reclaim.