Specifications include, but are not limited to: The installation of approximately 14,510 linear feet of 12” water main pipe connecting to existing water mains, 715 linear feet of 12” water main pipe in casings, 280 linear feet of 22” steel casing via jack and bore under existing railroad, along with related fittings, hydrants, valves, water services, pavement repair, appurtenances, and other incidental work necessary for a complete installation.The work shall also include the installation of one new packaged drinking water booster station, and upgrades to the existing Dawkins Road control valve. SCADA upgrades and telemetry components at 15 sites, including control panels, control panel assembly, wiring and installation, electrical work and other incidental work necessary for a complete installation of the system for communication to a centralized location.