Specifications include, but are not limited to: replacing the existing North Albany wastewater lift station with a new wastewater lift station sized to handle existing peak flows without both pumps operating, and the capacity to accommodate development in North Albany. The existing lift station structure is not large enough to accommodate the future required capacity, so a new facility will need to be built.; North Albany lift station will need additional capacity to serve the urban growth boundary area tributary to the station. While the station does not have sufficient capacity to handle existing peak flows without both pumps operating, the station can still handle existing peak flows and some additional flows. The station does not have the capacity to handle further growth in the basin. ; The existing firm capacity of the station is 2,600 GPM. The existing force main is 18-inches in diameter and has a capacity of 6300 GPM. The existing site is on the corner of Springhill Drive and Hickory Street in North Albany. The Consultant will need to verify if the existing location can be used and will assist the City in any site selection.