Specifications include, but are not limited to: The first phase of a new handball court facility (1 of 5 courts) at Rotary Park. Included in the project will be excavation, grading, subgrade preparation, 6” aggregate base course, concrete curb, post-tensioned concrete slab court, masonry walls and LED lighting. 1 11.1 1 LS Mobilization 2 11.3 1 LS Excavation, Grading, Subgrade Preparation 3 11.4 98 SY 6” Aggregate Base Course (1 Court) 4 11.5 1 LS 20’x44’ Post-Tensioned Concrete Slab Court (1 Court) 5 11.6 1 LS Site Concrete (Single Curb Per MAG STD DTL 222, Type A) 6 11.7 1 LS Masonry Walls (1 Court) 7 11.8 1 LS Electrical and LED Lighting (1 Court) 8 11.9 1 LS Handball Court Surfacing (1 Court) 9 9.33 1 LS Owner Contingency