Specifications include, but are not limited to: 1.The contractor shall demolish the pool and pool decking only. No structures shall be included, and caution shall be taken to protect those structures. Any damage shall be the contractor’s responsibility to repair. 2.The contractor shall remove all debris from state property and properly dispose of offpark within applicable regulations. 3.The contractor shall pump all water into a retention pond to allow sedimentation filtering. If necessary, contractor may construct on site by means of rock and sand. 4. The contractor shall demo the pool liner by cutting into sections or using equipment to remove and load for disposal. 5.The contractor shall demo stainless steel skimmers and any other metal found in pool demo site. This metal must be removed from state park property and is up to contractor for disposal off-park. 6.The contractor shall start in the deep end (12 foot) marked area breaking up shotcrete/ gunnite floor and walls. Starting at this point the contractor shall compact replacement fill dirt at 1-foot intervals with vibratory roller compaction. It shall be acceptable for the contractor to break aggregate into pieces no more than 5 inches in size and add a layer of broken aggregate at 1-foot intervals. Each foot of fill soil shall have no more than 6-inches of broken aggregate added on top. There shall never be pieces of aggregate more than 5- inches in size added to fill. 7.The contractor shall supply fill material of clay/sand mixture as needed to within 1-foot of grade. The contractor shall supply and compact 1-foot of topsoil for final grade. 8.Starting at the sidewalk east side of the pool (west side of pool house), the contractor shall demo brick retaining wall and steps to pool. 9.The contractor shall demo pool deck including kiddie pool and deck 360 degrees around pool location. This includes concrete pad, foundations, and the brick retaining wall to the west of the pool. All demoed concrete containing metal and all brick shall be removed from park property and disposed of properly off site. 10.The contractor shall demo the surge tank located by the 12-foot depth marker and water fill valve. This shall include the concrete tank base. Tank that is estimated to be 20 foot deep. All concrete shall be removed and disposed of offsite. It shall be allowed to break up the aggregate in 5-inch pieces and compact 6 inches of broken aggregate for every foot of compacted fill.