Specifications include, but are not limited to: City of Tucson Parks and Recreation Department has 10 City of Tucson Parks with Backflow and Drinking fountain replacement needs. The Park will be completed in the order that the parks are listed. D.1. Scope of Work Listed below are 10 City of Tucson Parks with Backflow and Drinking fountain replacement needs. The Park will be completed in the order that the parks are listed. Attachment G - COT Install Detail #30 and Detail #53 to be used per Scope of Work below. Cherokee Park,1500 N. Delaware St 1.Backflow Scope of Work • Removal & Replacement of (1) 2’’ Backflow with a Febco LF825YA per COT Detail #30. • Removal & Replacement of (1) 1’’ Backflow with a Febco LF825YA per COT Detail #30. • Install new Flanged Curb stop on the downstream side of the Municipal water meter for all new backflow installations. • Each Riser leg will have unions installed • Each backflow shall be in its own cage Per COT detail #30 Guard Shack HGS Series to be used • Backflows will be located where the existing backflows were located. New concrete pads. For multiple backflows in same area, it can be one pad with individual cages for each backflow. • COT Parks will supply locks for cages. 2.Drinking Fountain Scope of Work • Removal of (1) existing drinking fountain. • Installation of (1) MDF 10845-SMSS-01 (chrome color) with pet attachment per COT Detail #53 • Must be fully ADA accessible