Specifications include, but are not limited to: : Bids entered for items 1-8, are used for evaluation purposes only. The City of Tucson intends to award this contract to multiple vendors based on the totals of Group A and Group B of the Price Page of this IFB. Due to the volatile nature of copper, each time the City has a need for these items, the City will request quotes from each of the awarded vendors. Quotes must be submitted to the City within 48 hours or by no later than the end of two business days. The vendor with the lowest price, item availability, and or best delivery time on that particular quote will be selected to provide the materials under the terms and conditions of this contract. In addition, awards will be based on NET price before taxes. Each quote will be a separate and independent event and the outcome of one quote will have no impact on any of the other quotes. 1 10710 PIPE, COPPER, ¾", TYPE "K" SOFT, 60' COILS ONLY 21,540 FT; 2 10711 PIPE, COPPER, 1", TYPE "K" SOFT, 60' COILS ONLY 34,760 FT; 3 10712 PIPE, COPPER, 1½", TYPE "K" SOFT, 20' LENGTHS ONLY 1,900 FT; 4 10729 PIPE, COPPER, 2", TYPE "K" SOFT, 20' LENGTHS ONLY 5,360 FT; 5 11539 TUBING, COPPER, 1/4 inch OD, TYPE “K” SOFT, 50 FT ROLL, UTILITY 500 FT; 6 15257 PIPE, COPPER 3/8 inch x 50 FT COIL, TYPE “L”, SOFT TUBING 500 FT; 7 15738 PIPE, COPPER 3/4 INCH, TYPE K SOFT TUBING, 100 FT COIL 1,500 FT; 8 13953 PIPE, COPPER 1 INCH, TYPE K, SOFT TUBING, X 100 FT COIL 1,500 FT