Specifications include, but are not limited to: 1. See Scope of work in the drawings and specifications. Work includes the following: a. HVAC: Provide all materials and labor associated with a complete operational electrical distribution system. Major items of work include, but are not limited to: b. Provide exhaust fans and louvers for cross ventilation. 1) Welding stations and welding fumes equipment removal to be provided by owner. c. Plumbing: Provide all materials and labor associated with a complete operational electrical distribution system. Major items of work include, but are not limited to: 1) Provide an emergency eye wash station, utility sink and instantaneous water heater. 2) Water and sewer connect as noted on plans. d. Electrical: Provide all materials and labor associated with a complete operational electrical distribution system. Major items of work include, but are not limited to: 1) Electrical Service: Existing to remain with modifications. 2) Demolition: Disconnect and remove existing interior lighting as noted on drawings. 3) Power Systems: Provide miscellaneous duplex receptacles, connections for welder and H.V.A.C. equipment. 4) Fire alarm System: Expand/Modify/Upgrade existing addressable control panel to accommodate new initiating and indicating devices. Initiating devices shall be provided to comply with TDLR. 2. Equipment and installation cost proposals to follow San Benito C.I.S.D. procurement procedures. Including, but not limited to insurance, bid bonds, performance, and payment bonds. Coordinate with San Benito C.I.S.D. purchasing contractual requirements. 3. Provide miscellaneous work such as cutting, patching, and touch up painting as required.