Specifications include, but are not limited to: The work called for in these Bid Documents includes select interior and exterior site demolition and construction. The work includes, but is not limited to, new site paving, skylight replacement, new walls, painting, flooring, electrical, mechanical, and data at the OPS Mills Building located at 4311 N 30th Street, Omaha, NE 68111. The Project Specifications and scope of work are more fully set forth in the Project Plans and in the Project Specifications within the Project Manual that are a part of the Contract Documents. The Contractor will furnish all labor, materials, tools, equipment, and services necessary to provide a completed Project as outlined in the Contract Documents. In general, all materials and equipment to be furnished by Contractor must be of good quality, new and unused, free of defects, and shall be constructed and installed as required in the Contract Documents and of the types of equipment and materials as specified in the Contract Documents. It is the Contractor’s responsibility to protect existing construction. In addition, daily removal of debris and repair of any damage due to work under this Contract is considered within the scope of work and is the responsibility of the Contractor. All work must be done in accordance with best trade practices using qualified workmen. All work shall be performed in a manner that does not void any manufacturer’s warranty. All engineering work and plan preparations for shop drawings and other Contractor submittals shall be the responsibility of the Contractor, who shall utilize qualified and licensed engineers for such work.